Process
How long does mold remediation take in a typical Gettysburg home?
Most jobs in Historic Gettysburg or Barlow Knoll finish in two to four days once the inspection is done. Larger older homes near the College can run toward five days when moisture is hidden in thick stone foundations or a crawl has to be included.
Drying is the part that will not be rushed so a painter can start. Equipment stays until meter readings drop, not until the room looks empty. We work Monday through Friday 8am to 6pm and Saturday 9am to 2pm.